double-skinned crabsVietnamese crab exportergood crabexellent crab

MRT Jakarta Invests Rp200 Billion to Expand Bundaran HI Underground Concourse

Teguh Adi Prasetyo
August 19, 2026 | 8:01 pm
SHARE
Integrasi Transit Jakarta President Director Ferdiansyah Roestam speaks to reporters during a site visit to the Extended Concourse project at Bundaran HI MRT Station in Central Jakarta on Wednesday, Aug. 19, 2026. (Beritasatu.com/Ilham Oktafian)
Integrasi Transit Jakarta President Director Ferdiansyah Roestam speaks to reporters during a site visit to the Extended Concourse project at Bundaran HI MRT Station in Central Jakarta on Wednesday, Aug. 19, 2026. (Beritasatu.com/Ilham Oktafian)

Jakarta. Integrasi Transit Jakarta (ITJ), a subsidiary of MRT Jakarta, is investing Rp200 billion ($13.5 million) to expand the underground concourse at Jakarta’s Bundaran HI MRT Station, with the project designed to improve connectivity to surrounding commercial areas.

The Extended Concourse project will add 4,439 square meters of space and provide direct underground connections to major destinations including Plaza Indonesia, Grand Hyatt, Wisma Nusantara, and Pullman Hotel.

Physical construction had reached 21% by mid-August 2026. ITJ expects progress to reach 25% by the end of August.

ITJ President Director Yulham Ferdiansyah Roestam said the project was initiated to strengthen intermodal connectivity and support the development of a transit-oriented development (TOD) ecosystem in central Jakarta.

ADVERTISEMENT

“Through this project, we are expanding the service area of Bundaran HI Station by 4,439 square meters,” Ferdiansyah said during a site visit in Central Jakarta on Wednesday.

Two New Entrances

Located beneath the Bundaran HI Transjakarta bus stop, the extended concourse will feature two new entrances, known as Muara 1 and Muara 2.

Muara 1 on the western side will provide access to Plaza Indonesia and Grand Hyatt, while Muara 2 on the eastern side will connect passengers to Wisma Nusantara and Hotel Pullman.

The western entrance will include an escalator, stairs, and an elevator, while the eastern entrance will have an escalator and stairs.

The project will also include knockdown panels that can eventually provide direct connections to the basement level of Plaza Indonesia and a future basement development at Wisma Nusantara.

“This will allow seamless interconnections with the surrounding commercial buildings,” Ferdiansyah said.

The expansion is expected to reduce the need for passengers to leave the station and cross busy roads or walk outdoors to reach nearby shopping and commercial destinations.

Construction Progresses on Three Fronts

Construction is currently being carried out simultaneously at three locations, including wall construction and reinforcement, waterproofing, mechanical, electrical, and plumbing (MEP) work, as well as installation of steel sheet piles (SSP).

Waterproofing work has been completed, while construction teams are continuing to strengthen and thicken the underground walls.

The project is being carried out in two main stages. Stage 1, running from April to September 2026, covers minor traffic diversions, SSP installation, bored-pile foundations, and the installation of struts and wallers.

To minimize disruption on Jalan MH Thamrin, one lane has been narrowed to 2.7 meters, while the Transjakarta busway is being used as a mixed-use lane along the Bundaran HI bus stop.

Stage 2, scheduled from October 2026 to May 2027, will focus on deep excavation and construction of the main concrete structures for Muara 1 and Muara 2.

Preparing for Future Passenger Growth

The expanded concourse is intended to accommodate rising passenger volumes as MRT Jakarta’s North-South Line Phase 2A between Bundaran HI and Kota begins full operations in 2029, followed by the East-West Line in 2032.

ITJ estimates the expanded facility will accommodate an additional circulation of about 6,000 passengers and visitors per day.

The 4,439-square-meter concourse will also feature 24 multifunctional areas for food and beverage outlets, retail, lifestyle businesses and public services, creating additional commercial activity around the station.

The project is targeted for completion in May 2027 and is scheduled to be inaugurated in June 2027 by the governor of Jakarta as part of celebrations marking the capital’s 500th anniversary.

The development is built around three concepts — Connect, Experience and Activate — aimed at transforming the expanded concourse from a transit space into an integrated commercial and public area in the heart of Jakarta.

Tags: Keywords:
Google Add Investor.id as a preferred source on Google +
SHARE

Related Articles


Lifestyle 1 hours ago

Jakarta Outranks Amsterdam in Global Public Transport Survey

Jakarta climbs two places to 15th in Time Out's 2026 public transport survey, with its governor citing better network integration.
News Oct 13, 2026 | 10:37 am

Jakarta Eyes MRT Expansion Beyond the Capital to South Tangerang

Jakarta is exploring an MRT extension to South Tangerang as a 22-kilometer route study nears completion.
News Aug 19, 2026 | 8:01 pm

MRT Jakarta Invests Rp200 Billion to Expand Bundaran HI Underground Concourse

MRT Jakarta is investing Rp200 billion to expand Bundaran HI Station with underground links to major commercial areas by 2027.
Business Aug 7, 2026 | 3:05 pm

MRT Jakarta Launches Tender for Rp 300b Dukuh Atas Pedestrian Deck

MRT Jakarta has launched the tender for its Rp 300 billion Dukuh Atas Pedestrian Deck, financed without using Jakarta's regional budget.
Lifestyle Jul 29, 2026 | 1:40 pm

Visiting Jakarta? You Can Now Ride the MRT with Your Credit Card

Foreign visitors can now use Visa and Mastercard to ride Jakarta's MRT without buying or topping up transit cards.
News Jul 29, 2026 | 1:18 pm

Jakarta Unveils Details of Underground MRT Links to Landmark Hotels

Jakarta is building underground walkways linking Bundaran HI MRT Station with landmark hotels and malls to improve walkability.
News Jul 9, 2026 | 1:58 pm

Jakarta MRT Targets 2027 Opening for Bundaran HI–Monas Extension

Jakarta MRT has connected its 5.8-km Phase 2A tunnels, a major milestone toward expanding the metro by 2029.
Lifestyle Jul 1, 2026 | 9:41 pm

Jakarta Plans Underground Walkways Linking Landmark Hotels, MRT

Jakarta plans underground links connecting landmark hotels to the MRT as part of a broader push to improve mobility and tourism.
News Jun 22, 2026 | 1:16 pm

Jakarta Offers Free Transport and Tourist Attractions for 499th Anniversary Celebrations

Jakarta offers free MRT, TransJakarta, and entry to major attractions for 499th anniversary celebrations.
Business Jun 10, 2026 | 3:34 pm

Jakarta Sees Opportunity in Fuel Price Increase to Boost Public Transit Use

Governor Pramono said higher fuel prices could encourage more residents to switch from private vehicles to public transportation.

The Latest


Lifestyle 1 hours ago

Jakarta Outranks Amsterdam in Global Public Transport Survey

Jakarta climbs two places to 15th in Time Out's 2026 public transport survey, with its governor citing better network integration.
Business 2 hours ago

MSCI Concerns, Tighter IDX Trading Rules Send Indonesian Stocks Down 5% by Midday

Indonesian stocks plunge 5% by midday as MSCI concerns weigh on sentiment and the IDX tightens its daily downside limit to 7%.
News 2 hours ago

Jakarta Prepares 367 Health Facilities as Haze Reaches the Capital

Jakarta prepares 367 health facilities to treat potential haze-related illnesses after smoke from Sumatra and Kalimantan crosses the region.
News 2 hours ago

Jakarta Expands Flood Prevention With New Water Storage Ponds

Jakarta opens two East Jakarta water storage ponds as it expands flood prevention efforts through reservoirs and river normalization.
Special Updates 3 hours ago

Press Council Highlights AI Ethics at United Tractors Journalist Workshop

United Tractors’ 2026 journalist workshop highlights ethical AI use and the importance of trust and credibility in journalism.
COPYRIGHT © 2026 JAKARTA GLOBE. ALL RIGHTS RESERVED