double-skinned crabsgood crab

MRT Jakarta Completes Southbound Tunnel Linking Glodok and Kota Stations

Antara
October 28, 2024 | 9:46 pm
SHARE
The aerial photo shows the ongoing project of a mass rapid transit (MRT) rail along Gajah Mada street in Jakarta on January 19, 2023. (B Universe Photo/Joanito De Saojoao)
The aerial photo shows the ongoing project of a mass rapid transit (MRT) rail along Gajah Mada street in Jakarta on January 19, 2023. (B Universe Photo/Joanito De Saojoao)

Jakarta. Mass Rapid Transit Jakarta (MRT Jakarta) has completed the construction of the southbound tunnel linking Glodok Station and Kota Station as of Monday.

"This afternoon marks an important milestone as we have completed the southbound tunnel from Kota Station to Glodok Station," said Weni Maulina, Director of Construction at MRT Jakarta.

The newly built tunnel spans approximately 240 meters and will serve as a rail line heading south toward Lebak Bulus. Meanwhile, the northbound tunnel was completed in July 2024.

According to Weni, the tunnel-boring machine began work at Kota Station on Sept. 4, 2024, operating both day and night. This same machine is now being prepared to continue constructing the southbound tunnel from the southern side of Glodok Station to the northern side of Mangga Besar Station. Meanwhile, the northbound tunnel is being excavated by Tunnel Boring Machine 2 from the southern side of Glodok Station to the northern side of Mangga Besar Station. Weni said construction is expected to be completed by the end of 2024.

ADVERTISEMENT

Glodok Station is being constructed alongside Kota Station. It will consist of two levels, measuring approximately 240 meters in length and 19.8 meters in width, with a depth of up to 18 meters. In contrast, Kota Station will extend to three underground levels, measuring 231 meters in length, 17 meters in width, and reaching nearly 24 meters below ground.

Phase 2A of the Jakarta MRT project is being developed at an estimated cost of Rp25.3 trillion, funded through a cooperation loan between the Indonesian government and Japan.

Phase 2A consists of two stages: the first stage includes a main line of about 5.8 kilometers with six underground stations (Thamrin, Monas, Harmoni, Sawah Besar, Mangga Besar, and Glodok) and one at-grade station (Kota). The second stage, known as Phase 2B, will include Kota Station, Mangga Dua, Gunung Sahari, and Ancol, extending to a depot in West Ancol over approximately 5.2 kilometers. Phase 2B is currently in the feasibility study stage.

The MRT project began with Phase I, which connects Lebak Bulus to the Hotel Indonesia Roundabout and was inaugurated by President Jokowi in 2019.

Throughout 2023, the Jakarta MRT recorded nearly 33.5 million passengers, averaging over 91,000 daily users.

Tags: Keywords:
SHARE

Related Articles


Lifestyle Jul 29, 2026 | 1:40 pm

Visiting Jakarta? You Can Now Ride the MRT with Your Credit Card

Foreign visitors can now use Visa and Mastercard to ride Jakarta's MRT without buying or topping up transit cards.
News Jul 29, 2026 | 1:18 pm

Jakarta Unveils Details of Underground MRT Links to Landmark Hotels

Jakarta is building underground walkways linking Bundaran HI MRT Station with landmark hotels and malls to improve walkability.
News Jul 9, 2026 | 1:58 pm

Jakarta MRT Targets 2027 Opening for Bundaran HI–Monas Extension

Jakarta MRT has connected its 5.8-km Phase 2A tunnels, a major milestone toward expanding the metro by 2029.
Business Jun 10, 2026 | 3:34 pm

Jakarta Sees Opportunity in Fuel Price Increase to Boost Public Transit Use

Governor Pramono said higher fuel prices could encourage more residents to switch from private vehicles to public transportation.
News May 12, 2026 | 2:33 pm

Jakarta MRT Phase 2A on Track for 2029 Full Operation

Jakarta MRT Phase 2A reaches nearly 60% completion, linking HI Roundabout to Kota Tua with seven underground stations by 2029.

The Latest


News 3 hours ago

Prabowo Says South Korea's Lee Asked Indonesia to Help Open Dialogue With North Korea

President Prabowo Subianto says South Korea's Lee Jae Myung asked Indonesia to help open dialogue with North Korea.
News 8 hours ago

Pullman Hotel Fire in Jakarta Suspected to Stem From Electrical Fault

Police will deploy a forensic team to investigate a fire at Pullman Hotel in West Jakarta, with an electrical fault suspected as the cause.
Business 9 hours ago

Pertamina Slashes Prices of Three Fuels From Aug. 1

Pertamina cut prices for three non-subsidized fuels from Aug. 1.
News 10 hours ago

Trump Too Stubborn to Rejoin Paris Agreement: Indonesian Minister

Indonesia's Environment Minister Jumhur Hidayat says other countries should deal with Trump quitting the Paris Accord.
Business 12 hours ago

Indofood Sales Rise 9% as Rupiah Weakness Hits First-Half Profit

Indofood’s first-half sales rose 9%, but net profit fell 19% as rupiah weakness increased unrealized foreign-exchange losses.
COPYRIGHT © 2026 JAKARTA GLOBE. ALL RIGHTS RESERVED