double-skinned crabsVietnamese crab exportergood crabexellent crab

MRT Jakarta Completes Southbound Tunnel Linking Glodok and Kota Stations

Antara
October 28, 2024 | 9:46 pm
SHARE
The aerial photo shows the ongoing project of a mass rapid transit (MRT) rail along Gajah Mada street in Jakarta on January 19, 2023. (B Universe Photo/Joanito De Saojoao)
The aerial photo shows the ongoing project of a mass rapid transit (MRT) rail along Gajah Mada street in Jakarta on January 19, 2023. (B Universe Photo/Joanito De Saojoao)

Jakarta. Mass Rapid Transit Jakarta (MRT Jakarta) has completed the construction of the southbound tunnel linking Glodok Station and Kota Station as of Monday.

"This afternoon marks an important milestone as we have completed the southbound tunnel from Kota Station to Glodok Station," said Weni Maulina, Director of Construction at MRT Jakarta.

The newly built tunnel spans approximately 240 meters and will serve as a rail line heading south toward Lebak Bulus. Meanwhile, the northbound tunnel was completed in July 2024.

According to Weni, the tunnel-boring machine began work at Kota Station on Sept. 4, 2024, operating both day and night. This same machine is now being prepared to continue constructing the southbound tunnel from the southern side of Glodok Station to the northern side of Mangga Besar Station. Meanwhile, the northbound tunnel is being excavated by Tunnel Boring Machine 2 from the southern side of Glodok Station to the northern side of Mangga Besar Station. Weni said construction is expected to be completed by the end of 2024.

ADVERTISEMENT

Glodok Station is being constructed alongside Kota Station. It will consist of two levels, measuring approximately 240 meters in length and 19.8 meters in width, with a depth of up to 18 meters. In contrast, Kota Station will extend to three underground levels, measuring 231 meters in length, 17 meters in width, and reaching nearly 24 meters below ground.

Phase 2A of the Jakarta MRT project is being developed at an estimated cost of Rp25.3 trillion, funded through a cooperation loan between the Indonesian government and Japan.

Phase 2A consists of two stages: the first stage includes a main line of about 5.8 kilometers with six underground stations (Thamrin, Monas, Harmoni, Sawah Besar, Mangga Besar, and Glodok) and one at-grade station (Kota). The second stage, known as Phase 2B, will include Kota Station, Mangga Dua, Gunung Sahari, and Ancol, extending to a depot in West Ancol over approximately 5.2 kilometers. Phase 2B is currently in the feasibility study stage.

The MRT project began with Phase I, which connects Lebak Bulus to the Hotel Indonesia Roundabout and was inaugurated by President Jokowi in 2019.

Throughout 2023, the Jakarta MRT recorded nearly 33.5 million passengers, averaging over 91,000 daily users.

Tags: Keywords:
Google Add Investor.id as a preferred source on Google +
SHARE

Related Articles


News Oct 13, 2026 | 10:37 am

Jakarta Eyes MRT Expansion Beyond the Capital to South Tangerang

Jakarta is exploring an MRT extension to South Tangerang as a 22-kilometer route study nears completion.
News Aug 19, 2026 | 8:01 pm

MRT Jakarta Invests Rp200 Billion to Expand Bundaran HI Underground Concourse

MRT Jakarta is investing Rp200 billion to expand Bundaran HI Station with underground links to major commercial areas by 2027.
Business Aug 7, 2026 | 3:05 pm

MRT Jakarta Launches Tender for Rp 300b Dukuh Atas Pedestrian Deck

MRT Jakarta has launched the tender for its Rp 300 billion Dukuh Atas Pedestrian Deck, financed without using Jakarta's regional budget.
Lifestyle Jul 29, 2026 | 1:40 pm

Visiting Jakarta? You Can Now Ride the MRT with Your Credit Card

Foreign visitors can now use Visa and Mastercard to ride Jakarta's MRT without buying or topping up transit cards.
News Jul 29, 2026 | 1:18 pm

Jakarta Unveils Details of Underground MRT Links to Landmark Hotels

Jakarta is building underground walkways linking Bundaran HI MRT Station with landmark hotels and malls to improve walkability.
News Jul 9, 2026 | 1:58 pm

Jakarta MRT Targets 2027 Opening for Bundaran HI–Monas Extension

Jakarta MRT has connected its 5.8-km Phase 2A tunnels, a major milestone toward expanding the metro by 2029.
Business Jun 10, 2026 | 3:34 pm

Jakarta Sees Opportunity in Fuel Price Increase to Boost Public Transit Use

Governor Pramono said higher fuel prices could encourage more residents to switch from private vehicles to public transportation.
News May 12, 2026 | 2:33 pm

Jakarta MRT Phase 2A on Track for 2029 Full Operation

Jakarta MRT Phase 2A reaches nearly 60% completion, linking HI Roundabout to Kota Tua with seven underground stations by 2029.

The Latest


Special Updates 1 hours ago

Chandra Asri Group Receives Trade Finance Excellence Award, Reinforcing Its Role in Indonesia’s Industrial Development

Chandra Asri Group receives the Trade Finance Excellence Award at CIMB Niaga Business Summit 2026.
Special Updates 2 hours ago

AEON MALL Deltamas Brings 11 Sports and Creative Competitions to AEONLYMPIC 2026

AEON MALL Deltamas hosts AEONLYMPIC 2026, featuring 11 sports and creative competitions, with more than 3,100 participants.
Business 2 hours ago

Indonesian Stocks Extend Losses for Third Day, Fall 3.64% to 4,996

Indonesian stocks fell 3.64% on Monday, extending losses for a third straight session amid MSCI concerns and tighter trading limits.
News 4 hours ago

Prabowo Calls Meeting on Forest Fires as Haze Reaches Jakarta, Singapore

Prabowo summons senior officials to discuss forest fires as smoke reaches Jakarta and Malaysia pushes for regional action.
Lifestyle 5 hours ago

Jakarta Outranks Amsterdam in Global Public Transport Survey

Jakarta climbs two places to 15th in Time Out's 2026 public transport survey, with its governor citing better network integration.
COPYRIGHT © 2026 JAKARTA GLOBE. ALL RIGHTS RESERVED