exellent crabVietnamese crab exporterdouble-skinned crabs

Toyota Invests $76 Million for CATL-Backed Battery Project in Indonesia

Jayanty Nada Shofa
April 21, 2026 | 10:14 am
SHARE
A Toyota Yaris Cross hybrid car as seen in BTV Semesta Berpesta in Palembang on July 6, 2024. (B1 Photo/Yurike Metriani)
A Toyota Yaris Cross hybrid car as seen in BTV Semesta Berpesta in Palembang on July 6, 2024. (B1 Photo/Yurike Metriani)

Jakarta. The Indonesian arm of the Japanese automaker Toyota has just unveiled a Rp 1.3 trillion ($76 million) investment for a local battery development in partnership with China’s CATL.

In a press statement, the investor Toyota Motor Manufacturing Indonesia (TMMIN) estimated that the recent move should enable the company to begin exporting batteries in the second half of 2026. Shipments will not only encompass batteries installed within their hybrid electric vehicles (HEVs), but the company will also export them as components. Toyota did not say the targeted markets were.

According to TMMIN boss Nandi Julyanto, the company already produces battery packs for the hybrid four-wheelers Toyota Kijang Innova Zenix, Velos, and Yaris Cross in its Karawang plant. TMMIN is now seeking to hike its battery pack production capacity -- including battery cells and modules -- by teaming up with the world’s largest battery producer.

“We are currently importing the battery cell components and modules. The Indonesian workers will [later] produce these components,” Nandi was quoted as saying in the statement.

ADVERTISEMENT

Toyota claimed to have already invested a colossal Rp 100 trillion ($5.8 billion) over the past 55 years of operating in Indonesia.

Beyond hybrid batteries, Toyota is forging ahead with its plans to set up a bioethanol plant in Indonesia’s Lampung province. Pertamina NRE, the renewable subsidiary of the state-owned energy giant, is Toyota’s partner in the upcoming joint venture.

More Investment
Deputy Investment Minister Todotua Pasaribu told reporters on Monday that the project for the bioethanol facility alone had a price tag of “more or less between $200 million and $300 million”. The figure is still subject to change amid reviews, while saying investors would get tax holidays. 

“How Pertamina NRE and Toyota will divide the investment depends on their business-to-business talks. We, the government, are only in charge of facilitating the project,” Todotua said.

Toyota will break ground on this facility no later than Q4-2026 with a target to start production by 2028 -- just in time for Indonesia to execute its plan of including 10% ethanol content in its gasoline. 

Japan’s direct investments in Indonesia reached around $3.1 billion throughout 2025. During his first-ever Tokyo state visit last month, President Prabowo Subianto said that Indonesia “will continue to open up for Japanese participation” in its economy.

Tags: Keywords:
SHARE

Related Articles


Business Jul 27, 2026 | 11:42 pm

Toyota Accounts for Nearly 58% of Indonesia's Vehicle Exports

Toyota exported 145,080 vehicles from Indonesia in the first half, accounting for nearly 58% of the country's total vehicle exports.
Business Jul 14, 2026 | 5:50 pm

Takeda to Invest $30 Million in Indonesia's Plasma Medicine Industry

Takeda will invest $30 million to help develop Indonesia's plasma-derived medicines industry and plasma collection network.
News Jul 10, 2026 | 10:04 am

Rachmat Gobel Strengthens Decades-Long Role as Indonesia-Japan Bridge

Rachmat Gobel's decades-long ties with Japan spanned business, diplomacy and politics, making him a key bridge between both nations.
Business May 11, 2026 | 9:58 pm

Indonesia Car Sales Jump 12% as EV Demand Accelerates

Indonesia’s car sales climbed 12% in early 2026 as EV demand surged, helping Chinese brands gain ground against Astra.
Business Apr 21, 2026 | 10:14 am

Toyota Invests $76 Million for CATL-Backed Battery Project in Indonesia

From bioethanol plant to hybrid batteries, Toyota is ramping up its investment in Indonesia.
Business Apr 20, 2026 | 3:32 pm

Toyota to Construct Lampung Bioethanol Plant by Q4

The Toyota-Pertamina plant requires an investment of roughly between $200 million and $300 million.

The Latest


News 3 hours ago

Pullman Hotel Fire in Jakarta Suspected to Stem From Electrical Fault

Police will deploy a forensic team to investigate a fire at Pullman Hotel in West Jakarta, with an electrical fault suspected as the cause.
Business 3 hours ago

Pertamina Slashes Prices of Three Fuels From Aug. 1

Pertamina cut prices for three non-subsidized fuels from Aug. 1.
News 4 hours ago

Trump Too Stubborn to Rejoin Paris Agreement: Indonesian Minister

Indonesia's Environment Minister Jumhur Hidayat says other countries should deal with Trump quitting the Paris Accord.
Business 7 hours ago

Indofood Sales Rise 9% as Rupiah Weakness Hits First-Half Profit

Indofood’s first-half sales rose 9%, but net profit fell 19% as rupiah weakness increased unrealized foreign-exchange losses.
Business 8 hours ago

JCI Ends Week Higher as Investors Digest Earnings, Fed Decision

JCI rose 0.64% as strong corporate earnings offset uncertainty over Bank Indonesia’s leadership and foreign outflows.
COPYRIGHT © 2026 JAKARTA GLOBE. ALL RIGHTS RESERVED